The Monday Road Closure will not begin any earlier then 10 am. That should allow for normal morning commutes and for contractors to arrive in the morning as normal. If you are expecting concrete or other building materials be aware that taking the Winchester to Colt route is not feasible for loaded trucks. Schedule these trucks for before 10am. Departure for empty trucks via Colt and Winchester should not be a problem.
Pete Moncada 843-696-3089
Sent from my iPhone