Road closure update

The Monday Road Closure will not begin any earlier then 10 am. That should allow for normal morning commutes and for contractors to arrive in the morning as normal. If you are expecting concrete or other building materials be aware that taking the Winchester to Colt route is not feasible for loaded trucks. Schedule these trucks for before 10am. Departure for empty trucks via Colt and Winchester should not be a problem.
Pete Moncada 843-696-3089

Sent from my iPhone

Road Closure

We expect to replace the damaged culvert on Woodchuck on Monday. The road will be closed for a few hrs while this work is underway. Please use Colt to Winchester for egress and ingress of the East end of the neighborhood. I will update later with more specific hours.
Pete Moncada
Sent from my iPhone

Road Maintenance

We will be putting down gravel and grading at the Colt Rd Woodchuck intersection at 09:30 tomorrow July 19th. We will then move to the Frontage Rd Woodchuck intersection. Please use caution int these areas and drive slowly.
Pete Moncada 843-696-3089
Sent from my iPhone

Road conditions Warning

The Creek is over the road on Colt by the Woodchuck intersection. Proceed at your own risk. The creek is 8 “ from crossing Winchester at the Woodchuck intersection. If the water continues to rise and the creek crosses Winchester the intersection may quickly deteriorate and become impassable. Remember! Driving thru water moving over the road can be dangerous! Pete Moncada 843-696-3089 Sent from my iPhone

Roads

Colt , the east end of Woodchuck , Peacemaker and Winchester were graded to remove and reduce snow on the road margins. We will revisit the rest of the roads tomorrow the see if they a firm enough to use the grader.
Pete Moncada 843-696-3089
Sent from my iPhone

Roads

Conditions are improving. We were able to clear Highridge this morning. We will attempt to clear Colt and the Star area in the morning. The smaller roads will be cleared as conditions permit. We drove up Peak and Colt today and found them too saturated to attempt. We will visit Peak again on Friday to check it’s condition. All the smaller roads should be covered by the end of the weekend.
Pete Moncada 843-696-3089
Sent from my iPhone

Road conditions

The roads are saturated. We are not comfortable putting the 30,000 + pound grader on the roads till they firm up. With the forecast looking good for drying and firming we hope to resume grading toward the end of this week. Again we ask for your continued patience.
Pete Moncada 843-696-3089
Sent from my iPhone

Plowing

The grader will be out first thing in the morning. We will first clear Colt, the Star, and Winchester. Brian will then work on the other roads. Some are very soft due the water saturation. Some roads are too soft for the grader. Please watch out for the grader and let Brian work without interruption. Thank for your patience.
Pete Moncada 843-696-3089