Upper High Ridge and Peak have been widened by the dozer but are very soft and need work to push back the shoulders with our grader snow wing. Tentatively we will have our grader back in next couple days.
Upper Woodchuck – HR/Woodchuck intersection and north to the steep grade on the south slope, has been opened by the dozer, but is in poor condition and only a narrow single track. Do not attempt to use this section except in an emergency using 4WD vehicle with chains.
ALL AND ANY CONSTRUCTION PROJECTS, no matter where your property is located, MUST NOT BE INITIATED OR RESTARTED UNTIL OUR ROADS DRY OUT.