The hired grader has finished most roads except for upper High Ridge, upper Peak, upper Woodchuck and upper Peacemaker. The snow pack is too deep in these areas for the grader. Tomorrow we will have a dozer back to these areas to clear them. It will be about noon before the dozer is in place (H R/Peak intersection) to begin working. The order of work is Peak, then High Ridge, then Woodchuck, then Peacemaker.