Woodchuck has been and will continue to be graded to move the slush/ice off as much as possible. The secondary roads – Winchester, Sundown, Colt, High Ridge, Peak and feeder roads will be sanded starting tomorrow.
The grader is still in the shop waiting for parts to complete the repair of the drive train for the rear tandem wheels. Parts should be here before end to the week and the grader back in operation before end of next week.